Welcome, Guest     |   info@matelinc.com    |
Follow us on Facebook
Metal Finishes

Below is a listing of the finishes on our products and their lead times.

Finish Lead Time
07 - Satin Aluminum 2 Weeks
12 - Polished Aluminum 2 Weeks
19 - Satin Chrome (US26D) 3 Weeks
22 - Polished Chrome (US26) 3 Weeks
41 - Satin Gold 3 Weeks
50 - Plastic Laminate 4 Weeks
61 - Satin Brass/Bronze (US4) 3-4 Weeks
62 - Polished Brass/Bronze (US3) 3-4 Weeks
71 - Satin Duronotic 3 Weeks
73 - Antique Brass/Bronze (US10B) 3 Weeks
81 - Satin Black 3 Weeks
84 - Black Chrome 3-4 Weeks
89 - Mirror Black 3-4 Weeks

* A $100.00 EXPEDITING CHARGE FOR ANY ABOVE FINISH

Custom Finishes Lead Time
60 - Polished Stainless Steel #8 (US32) 3-4 Weeks
65 - Satin Stainless Steel #4 (US32D) 3-4 Weeks
70 - Polished Brass (Apollo) 3-4 Weeks
72 - Statuary Bronze 3-4 Weeks
Our clients include some of the following industry leaders
ABOUT MATEL

Matel has been manufacturing contract furnishings since 1985 and has become an industry leader with the ability to produce well designed products at the highest quality level. All products are manufactured in our Los Angeles factory which allows for many standard products to be shipped with short lead times.